Metallic Dream Epoxy | Premium Metallic Epoxy - 3 Gallon Kit

$220.00

Metallic Dream Epoxy | Premium Metallic Epoxy - 3 Gallon Kit

$220.00

Availability: In Stock. Products will be delivered between 1 and 5. In-store Pickup Available.

Description TDS / SDS Instructions How much do I need?

Metallic Dream 100% Solids Epoxy for Custom Metallic Floors

Metallic Dream Epoxy is a 100% solids epoxy formulated specifically for decorative metallic floors that require depth, movement, pigment suspension, and enough working time to create the design before the resin begins to lock up.

This is not a standard clear epoxy with metallic pigment added to it. Metallic Dream is designed around the requirements of a true metallic flooring installation, including extended flow, substantial film build, and 60 minutes or more of working time on the floor under suitable conditions.

In One Stop Epoxy professional grade metallic flooring systems, Metallic Dream is applied at approximately 50 square feet per gallon. One 3 gallon kit covers approximately 150 square feet at this application rate and produces approximately 32.1 mils of theoretical film thickness.

Free shipping to the 48 contiguous states, and most orders ship out the same or next business day.

Quick Answer: Metallic Dream is a 100% solids epoxy designed specifically for the decorative body coat of a metallic flooring system. It provides 60 minutes of working time on the floor. In the One Stop Epoxy professional grade metallic flooring system, Metallic Dream is applied at approximately 50 square feet per gallon. At that rate, one 3 gallon kit covers approximately 150 square feet and produces approximately 32.1 mils of theoretical film thickness.

Why Metallic Dream Is Different From General Purpose Epoxy

A metallic floor depends on more than adhesion and hardness. The epoxy must remain fluid long enough for the installer to place the material, add colors, manipulate the pattern, soften transitions, and allow the design to continue developing as the resin levels.

Metallic Dream Characteristic Why It Matters
60 Minutes of Working Time Provides time to place the epoxy, introduce additional colors, manipulate the pattern, and allow the resin to continue developing before it becomes too tight to work.
100% Solids Creates the substantial film build required for metallic pigment movement and visual depth.
500 to 750 cps Mixed Viscosity Provides controlled flow while allowing metallic pigments to move through the resin.
High Defoamer Content Helps control air in the thick metallic body coat. The resin may appear slightly whitish in the container but cures clear.
High Gloss Clear Cure Allows the metallic pigments and underlying base color to remain visible through the decorative body coat.

Why Our Professional Metallic Systems Use 50 Square Feet Per Gallon

In One Stop Epoxy professional grade metallic flooring systems, Metallic Dream is applied at approximately 50 square feet per gallon. The substantial thickness of the metallic body coat gives the pigments room to move, separate, and develop the depth associated with a professional metallic epoxy floor.

Professional System Rate Approximate Film Thickness 3 Gallon Kit Coverage
50 square feet per gallon Approximately 32.1 mils Approximately 150 square feet

Metallic Dream may be used at different coverage rates in other specifically designed flooring systems. Always follow the coverage rate specified for the complete flooring system being installed.

Do Not Stretch the Professional Metallic System: When installing the One Stop Epoxy professional grade metallic system, maintain a coverage rate of 50 square feet per gallon or less. If the floor is larger than the available material will cover at the specified rate, add material rather than spreading the body coat thinner.

Contractor Tip: Metallic floors are one place where trying to gain a few extra square feet from a kit can noticeably change the finished appearance. When installing the professional grade system, calculate the floor before mixing and have enough Metallic Dream available to maintain the specified film build from beginning to end.

The Complete Metallic Flooring System

Metallic Dream is the decorative body coat. A professional metallic floor is built as a complete system around it.

System Layer Purpose
Concrete Preparation Mechanically prepares the concrete for adhesion and removes coatings, sealers, contamination, and weak surface material.
Primer When Required Helps seal porous concrete and reduce bubbles and pinholes. One Stop WB Epoxy Primer is commonly used when pore sealing is needed.
Solid Color Base Coat Creates the uniform background beneath the metallic body coat. Use Self Leveling 100% Solids Epoxy in the selected base color.
Metallic Dream Body Coat Carries the metallic pigments and creates the movement, depth, color separation, and decorative design.
Clear Topcoat Provides the final wear surface and helps protect the metallic design from scratches, wear, chemicals, and cleaning.

Do not use 150 Fast Cure as the base coat beneath Metallic Dream. Professional metallic systems require an appropriate slower curing solid color epoxy base before the metallic body coat is installed.

If you prefer to purchase the primary layers as a complete package, see the Metallic Epoxy Flooring System.

The Base Coat Is Part of the Design

The color beneath Metallic Dream becomes part of the finished appearance. Black is commonly used because it creates strong contrast behind many metallic pigment combinations, but it is not the only option.

White, gray, tan, and other solid base colors can be selected intentionally to change the appearance of the metallic layer. The base color should be chosen as part of the complete design rather than treated as an automatic choice.

The Base Coat Must Be Clean and Smooth: Bubbles, pinholes, debris, repairs, roller texture, and other imperfections in the base coat can remain visible through the metallic body coat. Correct imperfections before applying Metallic Dream. For best results, sand the entire smooth base coat even when applying the metallic layer inside the chemical recoat window.

Choosing Metallic Pigments

Metallic Dream is supplied as the clear epoxy resin. The final design is created by adding one or more Metallic Epoxy Pigments.

A metallic floor can use one color, but many custom designs combine a dominant primary color with one or more accent colors. Changing the pigment combination, base color, placement technique, and manipulation method changes the finished appearance.

No two metallic floors will be identical. The epoxy continues to flow and settle after placement, so even the same colors and application technique will create natural variation from floor to floor.

60 Minutes of Working Time Is Design Time

Metallic Dream provides 60 minutes of working time on the floor under suitable conditions. That additional time is not simply there to make application easier. It gives the installer time to create and refine the design.

During the working period, installers may place additional colors, soften transitions, move material with a Magic Trowel, create veins, blend adjoining pours, or allow the resin to continue developing naturally.

Higher temperatures shorten working time. Material temperature, slab temperature, air temperature, batch size, and air movement can all affect how quickly the epoxy begins to tighten.

Mixing Metallic Dream

Metallic Dream is supplied as a 2 parts Part A to 1 part Part B by volume epoxy system.

  1. Add metallic pigment to Part A first. Completely disperse the metallic pigment into the Base before adding the Activator.
  2. Allow the pigmented Base to settle. Allowing the pigment to fully wet out and incorporated air to escape can help reduce pigment clumps and unwanted streaking in the finished floor.
  3. Add Part B. Pour the Activator directly into the center of Part A. Avoid pouring Activator onto the sides of the container.
  4. Use a Cage or Box style mixer for a full 3 gallon kit. Full kits require a mixer capable of moving the thick epoxy throughout the entire container.
  5. Mix according to material temperature. Mix for 2 full minutes at approximately 300 to 450 RPM when the material is above 75 degrees Fahrenheit and 3 full minutes when the material is below 75 degrees Fahrenheit.

Mix it and GET IT OUT OF THE BUCKET.

Metallic Dream is a 100% solids epoxy. Once Part A and Part B are completely mixed, immediately pour the material onto the floor. Leaving mixed epoxy concentrated in the bucket allows heat to build and reduces usable working time.

Applying the Metallic Body Coat

Metallic epoxy application is different from installing a conventional solid color roll coat. The objective is to place a thick, controlled resin layer and then create the design within that material.

  1. Pour immediately. Wearing spiked shoes, pour the mixed Metallic Dream onto the prepared base coat in controlled ribbons.
  2. Do not drain or scrape the mixing bucket onto the floor. Material remaining on the walls or bottom of the container may not be mixed as completely as the main batch.
  3. Follow the coverage rate specified for the flooring system. When installing the One Stop Epoxy professional grade metallic system, apply Metallic Dream at approximately 50 square feet per gallon or less.
  4. Manipulate the design. Use an 18 Inch Magic Trowel or another appropriate metallic design tool to place and blend the material.
  5. Work with the resin, not against it. Metallic Dream will continue to move and level after the initial design work is complete. Avoid repeatedly working areas that have already begun to tighten.
  6. Protect the wet floor. Control dust, hair, insects, debris, excessive air movement, and unnecessary traffic while the body coat is curing.

Contractor Tip: Build the entire color plan before mixing the first batch. Record the amount of each pigment used in every batch and determine where accent colors will be introduced. Metallic floors are much easier to keep visually consistent when the design is planned before the material reaches the floor.

Topcoating Metallic Dream

A clear topcoat is strongly recommended over a metallic floor. The Metallic Dream body coat creates the appearance, while the topcoat becomes the primary wear surface.

Premera T2 Gloss is an excellent choice when scratch resistance and a high gloss appearance are priorities.

Poly Gloss 85 Slow Go is another strong option when the installer wants substantially more topcoat working time on a metallic floor or a larger smooth surface.

The topcoat should be selected based on desired gloss, scratch resistance, working time, odor, floor size, traction requirements, and how the finished space will be used.

Metallic Dream Technical Specifications

Specification Product Information
Product Type Two component 100% solids metallic epoxy
Solids by Volume 100%
Mix Ratio 2 parts Part A to 1 part Part B by volume
Mixed Kit Size 3 gallons
Professional Metallic System Coverage Rate Approximately 50 square feet per gallon or less
Coverage Per 3 Gallon Kit at 50 Square Feet Per Gallon Approximately 150 square feet
Theoretical Film Thickness at 50 Square Feet Per Gallon Approximately 32.1 mils
Working Time 60 minutes on the floor under suitable conditions
Application Temperature Approximately 55 to 90 degrees Fahrenheit
Mixed Viscosity 500 to 750 cps
Shore D Hardness 89 to 91
Compressive Strength 16,500 psi
Tensile Strength 3,850 psi
Adhesion to Concrete 600 psi
Flexural Modulus 4,700 psi
Koenig Hardness 145
Taber Abrasion 22 mg loss
VOC Less than 50 grams per liter
Tack Free and Light Foot Traffic Approximately 12 to 18 hours depending on temperature and humidity
Heavy Foot Traffic Approximately 48 hours
Vehicle Traffic Approximately 72 hours

Where Metallic Dream Fits Best

  • Residential interior decorative floors
  • Game rooms and entertainment spaces
  • Showrooms and display areas
  • Retail interiors
  • Salons and studios
  • Offices and reception areas
  • Garage floors where appearance is the primary design goal

Where Metallic Dream Is Not the Best Fit

Metallic Dream is a decorative epoxy. It is not the right choice for every floor.

  • Exterior exposed floors: Not recommended. Clear epoxy can amber when exposed to direct sunlight.
  • Heavy industrial utility floors: A decorative metallic floor may not be the best choice where forklift traffic, severe impact, aggressive chemicals, or constant mechanical abuse are the primary concerns.
  • Full flake broadcast floors: Use a resin designed specifically for the broadcast system.
  • Basic solid color floors: Metallic Dream is intended to create a decorative metallic body coat, not a conventional solid color finish.

Frequently Asked Questions

What makes Metallic Dream different from regular 100% solids epoxy?

Metallic Dream is formulated specifically as a metallic body coat. It provides 60 minutes of working time, controlled flow, pigment suspension, and the substantial film build needed for metallic movement and depth.

How much working time does Metallic Dream provide?

Metallic Dream provides approximately 60 minutes of working time on the floor under suitable conditions. Higher temperatures can shorten the available working time.

How much Metallic Dream should I apply?

Coverage depends on the flooring system being installed. In One Stop Epoxy professional grade metallic flooring systems, Metallic Dream is applied at approximately 50 square feet per gallon or less, providing approximately 150 square feet from a 3 gallon kit at 50 square feet per gallon. Always follow the coverage rate specified for the complete flooring system.

How many square feet does one 3 gallon kit cover in the professional metallic system?

At 50 square feet per gallon, one 3 gallon kit covers approximately 150 square feet. If the professional system calls for a heavier application, actual coverage will be lower.

Do I need a base coat under Metallic Dream?

Yes. Metallic Dream should be installed over a properly prepared solid color epoxy base coat. The base creates a uniform background and prevents concrete color, repairs, and surface variation from interfering with the metallic design.

Can I use 150 Fast Cure as the base coat?

No. Do not use 150 Fast Cure as the base coat beneath Metallic Dream. For the professional metallic system, use an appropriate slower curing solid color epoxy such as One Stop Epoxy Self Leveling 100% Solids Epoxy.

Does the base coat have to be black?

No. Black creates strong contrast behind many metallic colors, but white, gray, tan, and other colors can be used intentionally to create different effects.

Should I sand the base coat before applying Metallic Dream?

For best results, yes. Even inside the chemical recoat window, sanding a smooth epoxy base coat helps remove imperfections and provides additional mechanical adhesion. Correct bubbles, pinholes, dust, and other defects before installing the metallic body coat.

Can I use more than one metallic pigment?

Yes. Many metallic floors use a primary color with one or more accent colors. The pigments, base color, placement method, and manipulation technique determine the final appearance.

Will two Metallic Dream floors look exactly the same?

No. Metallic Dream continues to flow and develop after placement. Natural variation in pigment movement makes every finished floor different.

Is Metallic Dream beginner friendly?

Metallic flooring requires more planning and technique than a conventional epoxy roll coat. New installers should practice pigment ratios, placement, and design techniques on sample boards before attempting a large professional grade metallic floor.

What tool is used to create the metallic pattern?

An 18 Inch Magic Trowel is commonly used to spread and manipulate Metallic Dream. Other techniques can also be used depending on the desired design.

What topcoat should I use over Metallic Dream?

Premera T2 Gloss is a strong choice when scratch resistance and gloss are priorities. Poly Gloss 85 Slow Go is another option when extended topcoat working time is important.

Can Metallic Dream be used outdoors?

No. Metallic Dream should not be used as an exposed exterior flooring surface. Clear epoxy can amber when exposed to direct sunlight.

Build the Complete Metallic Floor

Metallic Dream is the decorative body coat. A complete metallic flooring system may also require concrete preparation, primer, a solid color epoxy base, metallic pigments, application tools, and a clear topcoat.

For a complete professional material package, see the Metallic Epoxy Flooring System.

Technical Data and Safety Information:
View One Stop Epoxy TDS and SDS Sheets

Technical Documents

Download the technical and safety data sheets for Metallic Dream Epoxy below:

Professional Metallic System: These instructions apply to Metallic Dream when used as the body coat in the One Stop Epoxy professional grade metallic flooring system. In this system, apply Metallic Dream at approximately 50 square feet per gallon or less. Other specifically designed Metallic Dream flooring systems may use different coverage rates and must follow the instructions supplied for that complete system.

Working Time: Metallic Dream provides approximately 60 minutes of working time on the floor under suitable conditions. Higher temperatures will shorten working time. Once Part A and Part B are completely mixed, immediately pour the epoxy onto the floor.

Application Equipment

  • Appropriate notched squeegee for the specified application rate
  • 12, 18, or 22 inch Magic Trowel or other approved metallic design tools such as a T Bar
  • 3 inch chip brush for detail areas
  • Spiked shoes
  • Cage or Box style mixer for full 3 gallon kits
  • Red paddle mixer for properly measured partial batches
  • Low speed drill capable of approximately 300 to 450 RPM
  • Clean measuring containers when dividing material or preparing accent colors
  • Clean containers for separately mixed accent colors

Prepare the Base Coat Before Mixing Metallic Dream

Metallic Dream is a clear decorative body coat. The condition and color of the base coat beneath it directly affect the finished floor.

  • Use a compatible solid color epoxy base coat. Do not use 150 Fast Cure beneath Metallic Dream.
  • The base coat must be fully bonded, uniform in color, clean, dry, and free of contamination. Never pour Metallic Dream over a wet or tacky base coat.
  • Correct bubbles, pinholes, debris, raised repairs, roller texture, or other imperfections before applying Metallic Dream.
  • For best results, lightly sand the entire smooth epoxy base coat even when Metallic Dream will be applied within the chemical recoat window.
  • After sanding, vacuum the floor thoroughly and remove all remaining dust before beginning the metallic body coat.

Contractor Tip: Inspect the base coat with good lighting before mixing Metallic Dream. A thick clear metallic body coat can make dust, hair, pinholes, repairs, and other surface defects more noticeable rather than hiding them.

Plan the Metallic Design Before Mixing

Do not begin designing the floor after the epoxy has already been mixed. Decide how the colors will be used before Part A and Part B are combined.

  • Determine the primary metallic color.
  • Determine any secondary or accent colors.
  • Calculate the amount of Metallic Dream required for the entire floor.
  • Record the amount of pigment used in each batch so the color remains consistent.
  • Decide where accent colors will be introduced.
  • Open and stage all pigments before mixing begins.
  • Have all tools, spiked shoes, mixing equipment, and clean containers ready.

Contractor Tip: Write down your pigment amounts. If the floor requires several batches, guessing at the color in later batches can create obvious changes across the finished floor.

Mixing Instructions

  1. Add metallic pigment to Part A first. Add the selected metallic pigment to the Base and mix until the pigment is completely dispersed and the material is uniform.
  2. Allow pigments to fully disperse and bubbles to escape. After adding the metallic pigment to the Base, mix thoroughly at medium speed for a minimum of 3 minutes. Once mixing is complete, allow the pigmented Base time for the pigment to fully wet out and disperse and for bubbles created during mixing to escape. Allow at least 30 minutes. For best results, we recommend allowing a minimum of 2 hours. Remember, no Activator has been added at this point.
  3. Add Part B. Once the pigment is fully dispersed, bubbles have been given time to release, and the floor and tools are ready, pour the Activator from the small container directly into the center of the Part A Base container. Avoid pouring Activator onto the sides of the Base container. Material left on the sides may not become completely mixed. If that material makes its way onto the floor, it may not cure properly and can leave soft spots. For this reason, never scrape material from the sides of the mixing bucket onto the floor.

Full 3 Gallon Kit: Use only a Cage or Box style mixer. Mix for 2 full minutes at approximately 300 to 450 RPM above 75 degrees Fahrenheit and 3 full minutes below 75 degrees Fahrenheit. Do not use a paddle mixer for a full kit, especially when installing a metallic epoxy floor. Paddle mixers do not move enough of this thick material through the entire batch quickly or consistently enough for reliable full kit mixing. This becomes even more important when mixing multiple kits for a larger metallic floor.

Partial Batch: Measure exactly 2 parts Part A to 1 part Part B by volume. A red paddle mixer may be used for partial batches. Mix only until the material is completely uniform. Smaller batches require less mixing time than larger batches. Do not exceed 3 minutes.

No induction time is required after Part A and Part B are combined. Metallic Dream is ready for placement immediately after mixing.

Mix it and GET IT OUT OF THE BUCKET.

Metallic Dream is a 100% solids epoxy. Once Part A and Part B are combined, the chemical reaction generates heat. Leaving the mixed material concentrated in the bucket allows heat to build and reduces usable working time. As soon as mixing is complete, immediately pour the epoxy onto the floor.

Professional Metallic System Coverage

When installing the One Stop Epoxy professional grade metallic system, maintain a coverage rate of 50 square feet per gallon or less.

Application Rate Approximate Film Thickness 3 Gallon Kit Coverage
50 square feet per gallon Approximately 32.1 mils Approximately 150 square feet

Do Not Stretch the Professional Metallic System: When installing the One Stop Epoxy professional grade metallic system, maintain a coverage rate of 50 square feet per gallon or less. If the floor is larger than the available material will cover at the specified rate, add material rather than spreading the body coat thinner.

Application Procedure

  1. Pour Metallic Dream immediately. Wearing spiked shoes, pour the mixed material onto the prepared base coat in controlled ribbons. Do not allow mixed epoxy to remain in the bucket.
  2. Do not drain or scrape the mixing bucket onto the floor. Material remaining on the sides or bottom of the container may not be mixed as completely as the main batch. Do not attempt to recover this material.
  3. Spread at the specified coverage rate. Use the appropriate notched squeegee to distribute Metallic Dream evenly across the floor. For the professional grade metallic system, maintain approximately 50 square feet per gallon or less.
  4. Introduce accent colors according to the design plan. Add secondary metallic colors while the body coat remains wet and fluid. Maintain consistent pigment amounts and placement from batch to batch.
  5. Manipulate the design. Use a Magic Trowel or T Bar to move, blend, soften, or create the desired pattern.
  6. Allow the epoxy to continue moving. Metallic Dream will continue to flow and develop after the initial design work is complete. The appearance when you stop working the floor will not necessarily be the exact appearance after the epoxy finishes leveling.
  7. Do not overwork material that has begun to tighten. Once an area begins to resist movement or no longer flows naturally, leave it alone. Continuing to manipulate curing epoxy can create unwanted marks and disrupt the design.
  8. Maintain continuity between batches. Place adjoining batches while the previous material is still workable so the transition can be blended into the overall design.
  9. Protect the wet floor. Keep dust, hair, insects, debris, excessive air movement, and unnecessary traffic away from the floor while Metallic Dream is curing. Do not have fans or HVAC vents blowing directly across the floor at any point during the installation or curing process.

Contractor Tip: Metallic epoxy does not need to be continuously manipulated for the entire 60 minute working period. Create the design, evaluate the movement, and know when to leave the resin alone. Metallic Dream will continue to develop after you stop touching it.

Working Time and Jobsite Conditions

Metallic Dream provides approximately 60 minutes of working time on the floor under suitable conditions. This is the time available for placement and design after the properly mixed epoxy has been poured onto the floor.

Higher temperatures shorten working time. Material temperature, slab temperature, surrounding air temperature, air movement, and batch size can all affect the way the resin flows and cures.

Important: Do not plan the installation around receiving exactly 60 minutes under every condition. Warm material, a warm slab, direct sunlight through windows, or high surrounding temperatures can shorten the available design time.

Before Applying the Clear Topcoat

Allow Metallic Dream to cure completely enough to accept the selected clear topcoat without disturbing the metallic body coat. Metallic Dream is typically tack free and ready for light foot traffic in approximately 12 to 18 hours depending on temperature and humidity.

Do not select the topcoat time from the clock alone. Confirm that the Metallic Dream surface is hard, stable, and ready for the next coating step.

  1. Inspect the cured body coat. Check for dust, debris, raised imperfections, contamination, or other defects that should be corrected before topcoating.
  2. Prepare the surface. For best results, lightly sand the entire smooth Metallic Dream surface before applying the clear topcoat, even when coating within the applicable chemical recoat window.
  3. If the chemical recoat window has been exceeded, establish a complete mechanical bond. Mechanically abrade the entire surface to a clean, uniformly dull finish before applying the next compatible coating.
  4. Vacuum thoroughly. Remove all sanding dust and contamination before applying the clear finish coat.
  5. Apply the selected compatible topcoat. Follow the mixing, coverage, temperature, and application instructions for the specific topcoat being installed.

Important: Metallic Dream creates the decorative body coat. The clear topcoat becomes the primary wear surface of the finished metallic floor. Select the topcoat based on the desired appearance, scratch resistance, traction, working time, and how the finished space will be used.

How Much Metallic Dream Epoxy Do I Need?

This calculator is designed for the One Stop Epoxy Metallic Epoxy Flooring System. The standard planning rate for the Metallic Dream body coat in this system is 50 square feet per gallon.

Each full Metallic Dream kit produces 3 gallons of mixed epoxy and covers approximately 150 square feet at 50 square feet per gallon. This produces approximately 32.1 mils of theoretical film thickness.

Standard Metallic System Rate: Use 50 square feet per gallon for normal material planning. A heavier application may be specified for some projects. Experienced installers may enter that lower coverage rate in the calculator below. Do not use a rate greater than 50 square feet per gallon for this flooring system.

Metallic Dream Kit Calculator

square feet
square feet per gallon

Standard system rate: 50 square feet per gallon. Enter a lower number only when the project specifically calls for a heavier Metallic Dream application.

Coverage Rate Limit: This calculator does not allow more than 50 square feet per gallon for the One Stop Epoxy Metallic Epoxy Flooring System. The rate has been reset to 50 square feet per gallon.

Kits to Order
6
3 gallon kits
Material Required
16.0
gallons
Material Ordered
18
gallons
Approximate Film Thickness
32.1
mils
Coverage Per Kit:
150 square feet
Extra Coverage in Hand:
100 square feet

Cutting It Close: This order leaves approximately 0 square feet of theoretical extra coverage. That is less than 5% of one kit's coverage at the selected application rate. Material left in containers, edges, floor variation, and normal installation loss can use that margin quickly. Consider adding another kit.

Quick Kit Planning Guide

The table below uses the standard 50 square foot per gallon planning rate for the One Stop Epoxy Metallic Epoxy Flooring System. Heavier applications will cover less floor area per kit.

3 Gallon Kits Mixed Epoxy Coverage at 50 Square Feet Per Gallon
1 Kit 3 gallons 150 square feet
2 Kits 6 gallons 300 square feet
3 Kits 9 gallons 450 square feet
4 Kits 12 gallons 600 square feet
5 Kits 15 gallons 750 square feet
6 Kits 18 gallons 900 square feet
7 Kits 21 gallons 1,050 square feet
8 Kits 24 gallons 1,200 square feet

Why the Metallic Flooring System Uses 50 Square Feet Per Gallon

Metallic Dream is intentionally applied much thicker than a conventional epoxy coating in the One Stop Epoxy Metallic Epoxy Flooring System.

At 50 square feet per gallon, 100% solids Metallic Dream produces approximately 32.1 mils of theoretical film thickness. That substantial resin layer gives the metallic pigments room to move, separate, flow, and develop the depth associated with this metallic flooring system.

Approximate film thickness = 1,604 divided by square feet per gallon.

Maintain the Specified Coverage: When installing the One Stop Epoxy Metallic Epoxy Flooring System, use 50 square feet per gallon as the standard planning rate unless the specific project calls for a heavier application. If the floor is larger than the available material will cover at the specified rate, add material rather than spreading the body coat thinner.

Contractor Tip: Metallic floors are not a good place to plan around using every theoretical square foot of coverage. Have enough material available to maintain the specified film build across the entire floor and account for normal installation loss.

This Calculator Is for the Metallic Epoxy Flooring System

This calculator is based on the One Stop Epoxy Metallic Epoxy Flooring System. Metallic Dream may be used at different coverage rates in other specifically designed flooring systems.

Always follow the coverage, preparation, mixing, application, and topcoat instructions specified for the complete flooring system being installed.

Metallic Dream 100% Solids Epoxy for Custom Metallic Floors

Metallic Dream Epoxy is a 100% solids epoxy formulated specifically for decorative metallic floors that require depth, movement, pigment suspension, and enough working time to create the design before the resin begins to lock up.

This is not a standard clear epoxy with metallic pigment added to it. Metallic Dream is designed around the requirements of a true metallic flooring installation, including extended flow, substantial film build, and 60 minutes or more of working time on the floor under suitable conditions.

In One Stop Epoxy professional grade metallic flooring systems, Metallic Dream is applied at approximately 50 square feet per gallon. One 3 gallon kit covers approximately 150 square feet at this application rate and produces approximately 32.1 mils of theoretical film thickness.

Free shipping to the 48 contiguous states, and most orders ship out the same or next business day.

Quick Answer: Metallic Dream is a 100% solids epoxy designed specifically for the decorative body coat of a metallic flooring system. It provides 60 minutes of working time on the floor. In the One Stop Epoxy professional grade metallic flooring system, Metallic Dream is applied at approximately 50 square feet per gallon. At that rate, one 3 gallon kit covers approximately 150 square feet and produces approximately 32.1 mils of theoretical film thickness.

Why Metallic Dream Is Different From General Purpose Epoxy

A metallic floor depends on more than adhesion and hardness. The epoxy must remain fluid long enough for the installer to place the material, add colors, manipulate the pattern, soften transitions, and allow the design to continue developing as the resin levels.

Metallic Dream Characteristic Why It Matters
60 Minutes of Working Time Provides time to place the epoxy, introduce additional colors, manipulate the pattern, and allow the resin to continue developing before it becomes too tight to work.
100% Solids Creates the substantial film build required for metallic pigment movement and visual depth.
500 to 750 cps Mixed Viscosity Provides controlled flow while allowing metallic pigments to move through the resin.
High Defoamer Content Helps control air in the thick metallic body coat. The resin may appear slightly whitish in the container but cures clear.
High Gloss Clear Cure Allows the metallic pigments and underlying base color to remain visible through the decorative body coat.

Why Our Professional Metallic Systems Use 50 Square Feet Per Gallon

In One Stop Epoxy professional grade metallic flooring systems, Metallic Dream is applied at approximately 50 square feet per gallon. The substantial thickness of the metallic body coat gives the pigments room to move, separate, and develop the depth associated with a professional metallic epoxy floor.

Professional System Rate Approximate Film Thickness 3 Gallon Kit Coverage
50 square feet per gallon Approximately 32.1 mils Approximately 150 square feet

Metallic Dream may be used at different coverage rates in other specifically designed flooring systems. Always follow the coverage rate specified for the complete flooring system being installed.

Do Not Stretch the Professional Metallic System: When installing the One Stop Epoxy professional grade metallic system, maintain a coverage rate of 50 square feet per gallon or less. If the floor is larger than the available material will cover at the specified rate, add material rather than spreading the body coat thinner.

Contractor Tip: Metallic floors are one place where trying to gain a few extra square feet from a kit can noticeably change the finished appearance. When installing the professional grade system, calculate the floor before mixing and have enough Metallic Dream available to maintain the specified film build from beginning to end.

The Complete Metallic Flooring System

Metallic Dream is the decorative body coat. A professional metallic floor is built as a complete system around it.

System Layer Purpose
Concrete Preparation Mechanically prepares the concrete for adhesion and removes coatings, sealers, contamination, and weak surface material.
Primer When Required Helps seal porous concrete and reduce bubbles and pinholes. One Stop WB Epoxy Primer is commonly used when pore sealing is needed.
Solid Color Base Coat Creates the uniform background beneath the metallic body coat. Use Self Leveling 100% Solids Epoxy in the selected base color.
Metallic Dream Body Coat Carries the metallic pigments and creates the movement, depth, color separation, and decorative design.
Clear Topcoat Provides the final wear surface and helps protect the metallic design from scratches, wear, chemicals, and cleaning.

Do not use 150 Fast Cure as the base coat beneath Metallic Dream. Professional metallic systems require an appropriate slower curing solid color epoxy base before the metallic body coat is installed.

If you prefer to purchase the primary layers as a complete package, see the Metallic Epoxy Flooring System.

The Base Coat Is Part of the Design

The color beneath Metallic Dream becomes part of the finished appearance. Black is commonly used because it creates strong contrast behind many metallic pigment combinations, but it is not the only option.

White, gray, tan, and other solid base colors can be selected intentionally to change the appearance of the metallic layer. The base color should be chosen as part of the complete design rather than treated as an automatic choice.

The Base Coat Must Be Clean and Smooth: Bubbles, pinholes, debris, repairs, roller texture, and other imperfections in the base coat can remain visible through the metallic body coat. Correct imperfections before applying Metallic Dream. For best results, sand the entire smooth base coat even when applying the metallic layer inside the chemical recoat window.

Choosing Metallic Pigments

Metallic Dream is supplied as the clear epoxy resin. The final design is created by adding one or more Metallic Epoxy Pigments.

A metallic floor can use one color, but many custom designs combine a dominant primary color with one or more accent colors. Changing the pigment combination, base color, placement technique, and manipulation method changes the finished appearance.

No two metallic floors will be identical. The epoxy continues to flow and settle after placement, so even the same colors and application technique will create natural variation from floor to floor.

60 Minutes of Working Time Is Design Time

Metallic Dream provides 60 minutes of working time on the floor under suitable conditions. That additional time is not simply there to make application easier. It gives the installer time to create and refine the design.

During the working period, installers may place additional colors, soften transitions, move material with a Magic Trowel, create veins, blend adjoining pours, or allow the resin to continue developing naturally.

Higher temperatures shorten working time. Material temperature, slab temperature, air temperature, batch size, and air movement can all affect how quickly the epoxy begins to tighten.

Mixing Metallic Dream

Metallic Dream is supplied as a 2 parts Part A to 1 part Part B by volume epoxy system.

  1. Add metallic pigment to Part A first. Completely disperse the metallic pigment into the Base before adding the Activator.
  2. Allow the pigmented Base to settle. Allowing the pigment to fully wet out and incorporated air to escape can help reduce pigment clumps and unwanted streaking in the finished floor.
  3. Add Part B. Pour the Activator directly into the center of Part A. Avoid pouring Activator onto the sides of the container.
  4. Use a Cage or Box style mixer for a full 3 gallon kit. Full kits require a mixer capable of moving the thick epoxy throughout the entire container.
  5. Mix according to material temperature. Mix for 2 full minutes at approximately 300 to 450 RPM when the material is above 75 degrees Fahrenheit and 3 full minutes when the material is below 75 degrees Fahrenheit.

Mix it and GET IT OUT OF THE BUCKET.

Metallic Dream is a 100% solids epoxy. Once Part A and Part B are completely mixed, immediately pour the material onto the floor. Leaving mixed epoxy concentrated in the bucket allows heat to build and reduces usable working time.

Applying the Metallic Body Coat

Metallic epoxy application is different from installing a conventional solid color roll coat. The objective is to place a thick, controlled resin layer and then create the design within that material.

  1. Pour immediately. Wearing spiked shoes, pour the mixed Metallic Dream onto the prepared base coat in controlled ribbons.
  2. Do not drain or scrape the mixing bucket onto the floor. Material remaining on the walls or bottom of the container may not be mixed as completely as the main batch.
  3. Follow the coverage rate specified for the flooring system. When installing the One Stop Epoxy professional grade metallic system, apply Metallic Dream at approximately 50 square feet per gallon or less.
  4. Manipulate the design. Use an 18 Inch Magic Trowel or another appropriate metallic design tool to place and blend the material.
  5. Work with the resin, not against it. Metallic Dream will continue to move and level after the initial design work is complete. Avoid repeatedly working areas that have already begun to tighten.
  6. Protect the wet floor. Control dust, hair, insects, debris, excessive air movement, and unnecessary traffic while the body coat is curing.

Contractor Tip: Build the entire color plan before mixing the first batch. Record the amount of each pigment used in every batch and determine where accent colors will be introduced. Metallic floors are much easier to keep visually consistent when the design is planned before the material reaches the floor.

Topcoating Metallic Dream

A clear topcoat is strongly recommended over a metallic floor. The Metallic Dream body coat creates the appearance, while the topcoat becomes the primary wear surface.

Premera T2 Gloss is an excellent choice when scratch resistance and a high gloss appearance are priorities.

Poly Gloss 85 Slow Go is another strong option when the installer wants substantially more topcoat working time on a metallic floor or a larger smooth surface.

The topcoat should be selected based on desired gloss, scratch resistance, working time, odor, floor size, traction requirements, and how the finished space will be used.

Metallic Dream Technical Specifications

Specification Product Information
Product Type Two component 100% solids metallic epoxy
Solids by Volume 100%
Mix Ratio 2 parts Part A to 1 part Part B by volume
Mixed Kit Size 3 gallons
Professional Metallic System Coverage Rate Approximately 50 square feet per gallon or less
Coverage Per 3 Gallon Kit at 50 Square Feet Per Gallon Approximately 150 square feet
Theoretical Film Thickness at 50 Square Feet Per Gallon Approximately 32.1 mils
Working Time 60 minutes on the floor under suitable conditions
Application Temperature Approximately 55 to 90 degrees Fahrenheit
Mixed Viscosity 500 to 750 cps
Shore D Hardness 89 to 91
Compressive Strength 16,500 psi
Tensile Strength 3,850 psi
Adhesion to Concrete 600 psi
Flexural Modulus 4,700 psi
Koenig Hardness 145
Taber Abrasion 22 mg loss
VOC Less than 50 grams per liter
Tack Free and Light Foot Traffic Approximately 12 to 18 hours depending on temperature and humidity
Heavy Foot Traffic Approximately 48 hours
Vehicle Traffic Approximately 72 hours

Where Metallic Dream Fits Best

  • Residential interior decorative floors
  • Game rooms and entertainment spaces
  • Showrooms and display areas
  • Retail interiors
  • Salons and studios
  • Offices and reception areas
  • Garage floors where appearance is the primary design goal

Where Metallic Dream Is Not the Best Fit

Metallic Dream is a decorative epoxy. It is not the right choice for every floor.

  • Exterior exposed floors: Not recommended. Clear epoxy can amber when exposed to direct sunlight.
  • Heavy industrial utility floors: A decorative metallic floor may not be the best choice where forklift traffic, severe impact, aggressive chemicals, or constant mechanical abuse are the primary concerns.
  • Full flake broadcast floors: Use a resin designed specifically for the broadcast system.
  • Basic solid color floors: Metallic Dream is intended to create a decorative metallic body coat, not a conventional solid color finish.

Frequently Asked Questions

What makes Metallic Dream different from regular 100% solids epoxy?

Metallic Dream is formulated specifically as a metallic body coat. It provides 60 minutes of working time, controlled flow, pigment suspension, and the substantial film build needed for metallic movement and depth.

How much working time does Metallic Dream provide?

Metallic Dream provides approximately 60 minutes of working time on the floor under suitable conditions. Higher temperatures can shorten the available working time.

How much Metallic Dream should I apply?

Coverage depends on the flooring system being installed. In One Stop Epoxy professional grade metallic flooring systems, Metallic Dream is applied at approximately 50 square feet per gallon or less, providing approximately 150 square feet from a 3 gallon kit at 50 square feet per gallon. Always follow the coverage rate specified for the complete flooring system.

How many square feet does one 3 gallon kit cover in the professional metallic system?

At 50 square feet per gallon, one 3 gallon kit covers approximately 150 square feet. If the professional system calls for a heavier application, actual coverage will be lower.

Do I need a base coat under Metallic Dream?

Yes. Metallic Dream should be installed over a properly prepared solid color epoxy base coat. The base creates a uniform background and prevents concrete color, repairs, and surface variation from interfering with the metallic design.

Can I use 150 Fast Cure as the base coat?

No. Do not use 150 Fast Cure as the base coat beneath Metallic Dream. For the professional metallic system, use an appropriate slower curing solid color epoxy such as One Stop Epoxy Self Leveling 100% Solids Epoxy.

Does the base coat have to be black?

No. Black creates strong contrast behind many metallic colors, but white, gray, tan, and other colors can be used intentionally to create different effects.

Should I sand the base coat before applying Metallic Dream?

For best results, yes. Even inside the chemical recoat window, sanding a smooth epoxy base coat helps remove imperfections and provides additional mechanical adhesion. Correct bubbles, pinholes, dust, and other defects before installing the metallic body coat.

Can I use more than one metallic pigment?

Yes. Many metallic floors use a primary color with one or more accent colors. The pigments, base color, placement method, and manipulation technique determine the final appearance.

Will two Metallic Dream floors look exactly the same?

No. Metallic Dream continues to flow and develop after placement. Natural variation in pigment movement makes every finished floor different.

Is Metallic Dream beginner friendly?

Metallic flooring requires more planning and technique than a conventional epoxy roll coat. New installers should practice pigment ratios, placement, and design techniques on sample boards before attempting a large professional grade metallic floor.

What tool is used to create the metallic pattern?

An 18 Inch Magic Trowel is commonly used to spread and manipulate Metallic Dream. Other techniques can also be used depending on the desired design.

What topcoat should I use over Metallic Dream?

Premera T2 Gloss is a strong choice when scratch resistance and gloss are priorities. Poly Gloss 85 Slow Go is another option when extended topcoat working time is important.

Can Metallic Dream be used outdoors?

No. Metallic Dream should not be used as an exposed exterior flooring surface. Clear epoxy can amber when exposed to direct sunlight.

Build the Complete Metallic Floor

Metallic Dream is the decorative body coat. A complete metallic flooring system may also require concrete preparation, primer, a solid color epoxy base, metallic pigments, application tools, and a clear topcoat.

For a complete professional material package, see the Metallic Epoxy Flooring System.

Technical Data and Safety Information:
View One Stop Epoxy TDS and SDS Sheets

0 watching this item.
0 have this item in their cart.
Previous Product Next Product
Professional Grade

Professional Grade

Professional grade systems trusted by contractors and serious DIY installers nationwide.

Nationwide Shipping

Nationwide Shipping

Free to the 48 contiguous states, with low cost shipping to Alaska and many Latin American countries.

Technical Support

Technical Support

Talk to real, experienced installers before, during, and after your project.

5 Star Rated Business

5 Star Rated Business

Positive reviews from a growing number of happy customers.